It has been nearly two years since I began my she shed project at my mountain cabin property. The she shed structure’s progress has encountered several road blocks along the way. That first summer it took several months, instead of days, to improve the build site and complete the custom designed Tuff Shed properly. Last fall, improvements to Sherry’s She Shed were halted due to the Cameron Peak wildfire evacuation. Then, winter set in. Now, I’m back at it with some help and the she shed structure’s (say that three times fast) progressing again.
I recently hired a family friend and master carpenter, Matt Tanner, to install a window I purchased at Home Depot last fall. I asked him to install it with the bottom sill about 32″ from the floor so my desk can sit right underneath it. Matt also added 2″ x 4″ bracing around the small windows on two sides of the shed. Little did I know at the time, but I saved a ton of money since I purchased the materials last fall. Building materials are now outrageously expensive.
Once Matt finished installing the window and bracing, I was able to complete the insulation installation. Finally, the she shed structure’s progressing and now it has a window view.
P.S. A hiccup I’m dealing with now is the neighbor’s new rubbish pile on their property but is also near the entrance to mine: